News and UpdatesCheck back regularly for updates.

  • Feb 28, 2012 | Major Project Completion

    COMDESCO completes design and permitting for a major cellular carrier's 85 route-mile aerial and underground fiber project.

    More Information
  • Jun 01, 2011 | AERIAL Network News

    COMDESCO completes engineering and permitting for 400+ route miles of aerial fiber for a major telecom provider's installation of a federally funded educational network.

    New Contact Information
  • Mar 15, 2011 | Team Expansion

    COMDESCO brings on a new Utility Coordinator, two new Field Engineers, and a new Project Manager.

    New Contact Information
  • Sep 14, 2009 | State of the Art

    Comdesco employs the latest in GPS surveying technology including Trimble robotic and pole mounted GPS site positioning systems.

    More Information
  • Aug 12, 2009 | New Location

    Comdesco has relocated to a new location. We had outgrown the previous design center and needed a larger facility to better accomodate our clients' expanded needs.

    New Contact Information

Client Satisfaction Survey:

CLICK to fill out our Client Survey

Field Surveying

A solid well designed underground utility starts with solid field data. COMDESCO employs state of the art GPS grade field survey gear to provide sub-centimeter accuracy for our designs. Our field engineers are trained in the use of TRIMBLE "Rover" and "Robot" VRS networked surveying equipment along with TRIMBLE handheld data collectors. All collected data is uploaded to our CAD design department where it is translated into the base for your proposed design. Here are a few of the ways we use our field survey gear:

- Collecting landmark, structure, utility, and other field data to build an accurate base
- Staking out a designed route for construction
- Marking location of physically located utilities
- Collecting accurate as-built data
- Locating your facilities from previously collected as-built data

WHAT ARE THE BENEFITS?

First off, field data can be quickly translated into a CAD format. This eliminates hours of time required to interpret and translate hand written field notes. Not to mention, the elimination of "human error" in that translation process. Secondly, the accuracy of our field data is typically sub-centimeter. This ensures your design will not conflict with other utilities or known structures due to measurement errors. Finally, with the data loaded back into our field units, we can easily find the same point in the field to stake out a route, or locate existing facilities with ease.

There is also another benefit to working with our field survey gear. If you choose to make use of COMDESCO's field inspection services, our inspectors will facilitate the use of field survey gear to record as-built data points for your project during or immediately after construction. This means accurate and fast translation and delivery of as-built data, opposed to attempting to work with "red-lined" drawings provided by other sources. If you do not make use of COMDESCO Field Inspection, we can still provide this service as a separate item.

Survey, Design
and Permitting


Comdesco Group is a full service design firm specializing in sub- surface utility engineering and aerial utility design. Capabilities include initial surveying, route proposal, and permitting.

more

Utility Coordination Services


Comdesco Group can perform Utility Coordination services for Legal Mandate Projects. We work with all State, County and Municipal Jurisdictions. Our experienced staff can help keep costs down.

more

Project Management & Inspection Services


Comdesco Group is your source for underground and aerial telecom construction inspection and project management services. Our team is ready to effectively implement your plan and keep you informed.

more
Testimonial